WBS05-main

Waterproof Bag WBS05

Casual, stylish and lightweight outdoor waterproof bag

WBS05-1 WBS05-2 WBS05-3 WBS05-4

Land or Water, Fear No Challenges - IPX7 Waterproof Backpack

Description: Simply inflate by blowing air into the valve. With an IPX7 waterproof rating, this backpack can be fully submerged in water and still remain 100% waterproof.

Valve

Valve

IPX7

IPX7

IPX7 Waterproof Backpack

Detachable Front Pocket Design, Versatility and Practicality

Whether you're in need of extra storage space or prefer a lightweight and close-fit design, this backpack is capable of meeting those needs easily. Simply detach the front pocket and it instantly transforms into a fanny pack, bringing more flexibility to your travels.

WBS05-details04
Detachable front pocket2 jt2 Detachable front pocket

Organized, Protected, Two-in-One Waterproof Backpack

From the separation of clothes and food to the shock protection for glassware, this backpack's internal partition pouch design has considered every detail.

Two-in-One Waterproof Backpack
Wet-dry Separation Design

Wet-dry Separation Design

Its wet-dry separation design allows you to easily and orderly store various items, ensuring the cleanliness of clothes and freshness of food.

Foam Design

Foam Design

Our shock-proof storage bag features a foam design that can effectively prevent glass items from being damaged during travel. We pay attention to every detail, all to make your journey more smooth.

DSC_0870

Organized Multi-Pocket Design

Designed with practicality in mind, this backpack offers side slot pockets for small items and a dedicated laptop sleeve for files or devices less than 16 inches. Keep your belongings organized and easily accessible.

Organized Multi-Pocket Design
Foam Padding

Foam Padding

The foam padding on the shoulders and back can dry quickly.

Wet-dry Separation Design

Adjustable Chest Straps

Adjustable chest straps and easy-to-move hip straps mean you can easily adjust the weight of the backpack to meet your needs.

Durable, Waterproof, Easy to Clean

Made of 1680D nylon and TPU coating, with strong puncture and tear resistance, it's a sturdy companion for your outdoor adventures. The backpack's easy-clean design allows you to effortlessly wash it with soap and water.

TPU Coating
1680D Nylon and TPU Coating

1680D Nylon and TPU Coating

Made of 1680D nylon and TPU coating, with strong puncture and tear resistance

Easy-clean

Easy-clean

The backpack's easy-clean design allows you to effortlessly wash it with soap and water.

More Space, More to Carry

This 13.0"x7.9"x19.7" backpack is ideal for all kinds of travel. Whether you need to pack for a day trip or a week's journey, its 30-liter capacity can meet your needs.

More Space More to Carry
More Space More to Carry2

Diverse Selection, Fashion & Convenience Merge

Suit your diverse needs with our range of backpacks, chest packs, and crossbody bags. Whether you're seeking casual everyday utility, weekend outdoor adventures, or a reliable business travel companion, you can find your ideal choice in the same series.

Diverse-Selection-Fashion-Convenience-Merge Diverse-Selection-Fashion-Convenience-Merge3 Diverse-Selection-Fashion-Convenience-Merge2 Diverse-Selection-Fashion-Convenience-Merge4 Diverse-Selection-Fashion-Convenience-Merge5

Product Parameters

The perfect companion for outdoor activities
Lunch/fishing/beach picnic/barbecue/park/hiking/camping/cycling

Product name:

Waterproof Bag WBS05

Product Type:

Waterproof Bag

Product size:

13.0"x7.9"x19.7"

Product Color:

Black

Product capacity:

30L

Weight:

0.9KG

Product material:

1680D Nylon TPU

Weierken has accumulated 19 years of global expertise in the bag industry since 2006.
We excel in producing a diverse selection of delivery bags tailored to meet various market needs.

Quick Links

Category

About Us

Customization

Resources

Get in touch

WhatsApp: +8613599063136
Skype: enci-amanda
Tel: +86-591-87666816
Phone: +86-13599063136
Add: No. 528, Xihong Road, Gulou District, Fuzhou City, Fujian Province.
 
Leave a Message
GET A QUOTE
​Copyright © 2024 Fuzhou Enxin International Business Co., Ltd. All rights reserved.